How we deploy
We send engineers. They stay until it works.
Our forward-deployed engineers bring MAIN, vision and automation onto your floor, set up the first job and stay with your team until it runs every day. Then they keep it running.
You call. We show up.
Tell us what’s slowing you down. An engineer is on your floor within days.
5 days to a fix.
We get that one problem working on your systems.
30 days to prove it.
Measured against your baseline. Then the next problem.

The process
Live in weeks. Not months.
Walk
We find the first job worth fixing.
Connect
Only what that job needs.
Go live
We stay until it runs every day.
Expand
Next job. Next line.
After go-live
We keep everything running. Whatever the brand.
We take over your service contracts and run them on AI. Preventive maintenance and repair for every machine on your floor, under one contract, with MAIN behind every visit.
- Service hub
- Machines we look after
- Stockholm
- Munich
- New York
- Los Angeles
- Shanghai
01 · Record
One record for every machine.
02 · Diagnose
Most faults fixed remotely.
03 · Fix
Trained, with parts in hand.
04 · Learn
Each fix makes the next faster.

The service platform
Any service contract. Run on AI.
Bring us the contracts you have today, whatever the machine or brand. We take them over and run them on MAIN. It books the visit before the machine stops, and the technician arrives with the part.
Visit booked by MAIN
Before it stops
Press 4 · Hydraulic pump
Pressure drifting 6% over two weeks. Likely seal wear.
- Technician
- Thursday, 07:30
- Part
- Seal kit, in the van
- History
- 3 visits · manual attached
- Expected stop avoided
- ≈ 9 hours
Fixed remotely
No visit needed
CNC-07 · Alarm 1012
Spindle overload after a tool change. Offset reset from the service desk.
- Diagnosed
- 4 minutes after the alarm
- Cause
- Wrong tool offset, T12
- Machine back up
- 06:52
- Downtime
- 18 min instead of a day
Technician on site
In progress
Robot R2 · Axis 3 gearbox
Torque spikes every third cycle. Gearbox swap under way.
- Arrived
- 14:05 · Anna, ABB certified
- Step
- 3 of 5 · new gearbox fitted
- Line
- Running on backup cell
- Back in production
- ≈ 15:30
Contract taken over
All on one contract
Plant 2 · 38 machines
Six old service contracts, now one. Every machine on a plan in MAIN.
- Brands covered
- Atlas Copco, Haas, ABB +4
- Preventive visits
- Planned for 12 months
- Open faults
- 0 of 38
- Contracts replaced
- 6 → 1

