Case studies
What Togy does on real factory floors.
Three live installations, and three ways MAIN pays back on the floor, in service and in engineering.

Machine Vision + MAIN · Medtech
71%
Every implant inspected. At full line speed.
Less scrap, from 14% to 4%

Machine Vision · Logistics
1,916 h
Every return tray checked. Weekdays and weekends.
Freed a year

Custom machine · Pharma
1.5 FTE
Manual tube de‑capping, automated. Up to two roles freed.
Freed at 75% occupancy

MAIN · Shop floor
−15%
Every stop explained, before the next shift.
Unplanned downtime

MAIN · Your machine fleet
−25%
Service your fleet before the customer calls.
Emergency call-outs

MAIN · Engineering
−50%
Answers in seconds, not in someone’s inbox.
Search time
MAIN cases are illustrative, built from industry benchmarks. Not measured customer results.

